A building permit is required before:
(a) constructing, reconstructing, repairing or altering a building or structure,
(b) removing or relocating a building or structure,
(c) changing an occupancy or use of a building or structure,
(d) conducting a “tenant improvement” in an existing commercial or industrial suite,
(e) removing, altering or adding a plumbing distribution system and or drain, waste and venting system,
(f) demolishing a building,
(g) constructing or adding a fireplace, woodstove or chimney,
(h) constructing or altering a farm building or,
(i) constructing or altering a retaining structure.
Note: Gas and Electrical Work is regulated by Technical Safety BC