Is this a quick fix that may have to be replaced in phase 2 or later?
No, this is not a quick fix. Phase 1 will resolve the current and pressing public health and environmental issues with the existing disposal fields located on Forestry Road and next to Bear Lake. In Phase 2 (future) the individual properties of the existing 49 customers would be connected to the pressurized sewer pipe installed in Phase 1. The two existing septic tanks could then be decommissioned. Phase 2 would resolve the issues with the existing collection system, such as blockages and resulting sewage back-ups.

1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
27.
28.
29.
30.
31.
32.
33.
34.
35.
36.
37.
38.
39.
40.
41.
42.
43.
44.
45.
46.
47.
48.
49.
50.
51.
52.
53.
54.
55.
56.
57.
58.
59.
60.
61.
62.
63.
64.
65.
66.
67.
68.
69.
70.
71.
72.
73.
74.
75.
76.
77.
78.
79.
80.
81.
82.
83.
84.
85.
86.
87.
88.
89.
90.
91.
92.